Kiwispan Fielding Project |
In 2020 Kiwispan contracted Advanced Dairy Barns Ltd to supply fully fabricated hot dip galvanised structural steel to them for a large project that they had for a client in Fielding.
These two sheds were to be used for the building of transportable houses inside so had to be large enough to enable these houses to be built, loaded onto trucks and then moved out of the building.
This required two sheds of:-
These two sheds were to be used for the building of transportable houses inside so had to be large enough to enable these houses to be built, loaded onto trucks and then moved out of the building.
This required two sheds of:-
- 7.5m Knee height.
- 10m width bays.
- 100m overall length
- 1 shed of 20m clear span with cantilever eave of 2.5m on one side.
- 1 shed of 30m clear span with cantilever eave of 2.5m on both sides.